The operator places the empty cylinder on the scale, connects it to the filling system and selects the appropriate fill icon. Customised software ensures the tare weight of the cylinder is correct for the size selected. Weighing the cylinder also confirms that it’s empty.
Before filling begins, the system verifies the filling valve is correctly fitted. If everything is correct, a green light indicates the operator can proceed and, once pressed, the fill commences. If the tare weight is out of tolerance or the fill valve is not fitted properly, an alarm sounds and the system prevents the fill occurring.
Once filling begins, the operator is free to perform other tasks. When each cylinder’s target weight is achieved, the system automatically closes the fill valve and stops the pump.